Parallel joint set
In stock
- Compatible with 28 mm pipes
- Assembly required
- Help increase loading capacity
The HJ-13 is a black metal joint set generally used to reinforce the structure's capacity.
To assemble an HJ-13 you need to put two H-13 together with an M6-25B bolt and an M6-N nut.
Assembly tip:
This joint set is frequently used for the assembly of workstation, rack or cart requiring a high load capacity. For more information on the different ways to increase your structure's loading capacity, read our article How to calculate the loading capacity for modular structures.
Installation Steps:
See the installation steps tab to view how to assemble this connector.
Antistatic Version (ESD):
An electric conductivity version if offered if you wish to build antistatic structures: HJ-13NP
Want to reuse parts of your old system?
The HJ-13 Flexpipe joint set is compatible with many other pipe and connector systems. Check the technical information tab to know which systems are compatible and none-compatible with our parts.
Units per box (sold separately) | NA |
---|---|
Needed parts | 2 (2x H-13 + 1x M6-25B + 1x M6-N |
Length inches | 2 11/16 in (68 mm) |
Width inches | 1 5/16 in (33 mm) |
External height inches | 1 5/16 in (33mm) |
External width inches | 2 11/16 in (94mm) |
External depth inches | 1 5/16 in (33mm) |
Steel thickness inches | 1/8 in (2.5 mm) |
Unit weight pounds | 0.253 lbs (0.115 kg) |
Compatible joint systems | Creform, NIS, C Tek Lean Solutions, Trilogiq (28 mm) |
Noncompatible joint systems | Fastube, Trilogiq (28.6 mm) |
RoHS certification | Yes |
Recyclable | Yes |
Compatible pipe systems | Creform, Fastube, Trilogiq (28 mm), NIS (28 mm), C Tek Lean Solutions (28 mm) |
Noncompatible pipe systems | Trilogiq (28.6 mm) |
Frequency of use | Moderate |
Reusable | Yes |
Reusable parts | Yes |
Electric conductivity (ESD) | No |
Material | Hot rolled steel (SPHC) |
Steel hardness (HRB) | 68-75 HRB |
Finish | Glossy |
UV resistance | High |
System operational temperature | -148°F to 572°F (-100°C to 300°C) |
Steel treatment | Black cathodic electrodeposition (Ecoating) |
Manufacturing technique | Stamping and deburring |
Striations for grip | None |
Positioning guide | None |
Additional reinforcement hole | None |
- Ensure you have the following parts:
- Group the two H-13 connectors around the first and the second pipe.
- Fix the connectors together by placing the bolt with the nut in the corresponding openings and completely tighten until the HJ-13 joint set is firmly attached to the pipes.

Need more informations ?
Here's everything you need to know!