ClickCease
Please select a wish list
SKU
W-6PF

6" Rigid Plate Caster

  • 6 inches (150 mm) diameter wheel
  • 500 pounds (227 kg) loading capacity
  • 2.5Mph maximum speed
4
12
32
Custom Quantity
USD$32.90
(USD$32.90 each)
Total Qty: 1
Columbia City (IN): 531
Los Angeles (CA): 88
619 units in stock Location details
+

The 6 inch casters are made for carts that will go outside, roll on ramps or damaged floors. This wheel is used for heavy duty structures like carts that transport massive parts and racks which need enormous support capacity. It's ideal for use in industrial settings such as large workstations and material handling solutions.

  • The casters have a double ball bearing
  • The wheel is made of thermoplastic rubber
  • Loading capacity of 500 pounds (227 kg)
  • Maximum speed of 2.5Mph (4.02 km/h)
  • To secure caster to your structure, you'll need to have (4) Extended Brackets for 6" Casters (WF-LARGE), (4) M8 x 45mm Bolts (M8-45B), and (4) M8 Nuts (M8-N).
More Information
Box Quantity 12
Height 7 1/2 in (190 mm)
Weight (kg/lbs) 3.91 lb (1.773 kg)
Box Dimensions Cardboard box of 18 X 11 X 12 in (460 X 280 X 300 mm)
Primary Material Thermoplastic Rubber (TPR)
Temperature Resistance -22°F to 158°F (-30°C to 70°C)
Electric Conductivity (ESD) No
Loading Capacity 500 lb (227 kg)
  1. Ensure you have the following parts:
    • 1x W-6PF
    • 4x WF-LARGE
    • 4x M8-45B
    • 4x M8-N
    • 2x 28mm pipes of your choice
    • 1x Wrench
    • 1x Ratchet
  2. Ensure that the structure is leveled when supported by the pipes that will be wheeled. Otherwise, the height difference might cause the structure to sway.
  3. Flip the structure for better access to the bottom pipes.
  4. Ensure the pipes are parallel and have 5 in. of center spacing.
  5. Place the two WF-LARGE perpendiculars on the pipes.
  6. Place the caster on both WF-LARGE and align the openings.
  7. Take another WF-LARGE and regroup it with one of the WF-LARGE on the pipes.
  8. Take two M8-45B bolts and two M8-N nuts and insert them into the corresponding openings. Then lightly tighten them together.
  9. Repeat steps 6 and 7 for the other WF-LARGE and the bolts and the nuts remaining.
  10. Tighten completely the four M8-45B bolts and the four M8-N nuts in a cross pattern.