Please select a wishlist
SKU
HJ-6ANP

Extended pivot joint set

Extend pivot joint set steel cr
USD$3.23

In stock

  • Compatible with 28 mm pipes
  • Assembly required
  • Joint set with antistatic properties (ESD)

The HJ-6ANP is a chrome-plated joint set with antistatic properties (ESD) that allows creating a two-pipe intersection with an adjustable angle up to 260 degrees. This joint set allows working with a wider angle radius than the HJ-6NP allows. It can be used for many applications such as the creation of angular sides and top or V-shaped racks with angles wider than 90 degrees. The distance created between the two pipes is used for supporting pannels or manufacturing parts.

To assemble an HJ-6ANP you need to combine two H-6ANP and two H-6NP together with two M6-25BWZ bolts and two M6-NWZ nuts.

Installation Steps:
See the installation steps tab to view how to assemble this connector.

Non-Electric Conductivity Version:
A version of this joint set is offered without antistatic properties: HJ-6A

Want to reuse parts of your old system?
The HJ-6ANP Flexpipe joint set is compatible with many other pipe and connector systems. Check the technical information tab to know which systems are compatible and none-compatible with our parts.

More Information
Best SellerNo
Units per boxNA
Length inches3 1/2 in (89 mm)
Width inches1 5/16 in (33 mm)
Steel thickness inches1/8 in (2.5 mm)
Unit weight pounds0.609 lbs (0.277 kg)
Compatible joint systemsCreform, NIS, C Tek Lean Solutions, Trilogiq (28 mm)
None compatible joint systemsFastube, Trilogiq (28.6 mm)
RoHS certificationYes
RecyclableYes
Compatible pipe systemsCreform, Fastube, Trilogiq (28 mm), NIS (28 mm), C Tek Lean Solutions (28 mm)
None compatible pipe systemsTrilogiq (28.6 mm)
ReusableYes
Electric conductivity (ESD)Yes
MaterialHot rolled steel (SPHC)
Steel hardness (HRB)68-75 HRB
FinishShiny
System operational temperature-148°F to 572°F (-100°C to 300°C)
Steel treatmentChrome plating
Manufacturing techniqueStamping and deburring
Striations for grip8 striation grip lines
Positioning guide8 positioning guide lines
Additional reinforcement holeNone
  1. Ensure you have the following parts:
    • 2x H-6NP
    • 2x H-6ANP
    • 3x M6-25BWZ bolts
    • 3x M6-NWZ nuts
    • 2x 28mm ESD pipes of your choice
    • 1x T-HANDLE 5mm hex key
  2. Take the two H-6NP connectors and group them around the first pipe.
  3. Fix the connectors by placing an M6-25BWZ bolt with an M6-NWZ nut in the corresponding openings until it's firmly attached to the pipe. A force between 12-14 Nm is recommended for this step. Make sure to place the bolts on the most accessible side.
  4. Group together with the two H-6ANP connectors around the second pipe and fix the connectors with an M6-25BWZ bolt and an M6-NWZ nut in the corresponding openings until it's firmly attached to the second pipe. A force between 12-14 Nm is recommended for this step.
  5. Insert the first pipe with the attached H-6NP connectors in between the H-6ANP connectors and loosely tighten with the remainings M6-25BWZ bolt and the M6-NWZ nut to both H-6NP and H-6ANP connectors through corresponding openings.
  6. Position into the desired angle and tighten completely until the HJ-6ANP joint set is firmly attached to the first and the second pipe. A force between 12-14 Nm is recommended for this step.