Please select a shopping list
SKU
HJ-5NP

5 way cross joint set

5 way cross joint set steel cr
CDN$5.32

In stock

The HJ-5NP is a metal anti-static connector set that allows you to create a five-pipe intersection on three axes. This joint is used in very specific and unique situations. This assembly is typically done to make a flag, or to make a wheel stand out in the middle of a structure.

To create an HJ-5NP, you need to group four H-2NP together with four M6-25BWZ bolts and four M6-NWZ nuts. Since this connector is made only from H-2NP, you should have all parts necessary in stock if you use a lot of HJ-2NP and HJ-3NP joints. This connector will not be used frequently on your Flexpipe structures. However, it could come in handy in the situations mentioned above. Before you consider using the HJ-5NP for wheels or flags, always check if you can replace it with HJ-2NP, HJ-3NP, or HJ-4NP, since those connectors have less effect on the structural strength.

This joint is the trickiest to assemble for beginners because it is made up of so many parts. Fortunately, you will have gained a good amount of experience with the Flexpipe system before having to assemble this joint. The HJ-5NP is equipped with a total of 16 striations for grip and 16 reinforcement holes. However, we still recommend that you check for stronger connectors before using it. The HJ-5NP is compatible with most 28mm pipe systems out there.
More Information
Best SellerNo
Units per boxNA
Needed parts4 (H4NP) + 4 (M6-25BWZ) + 4 (M6NWZ)
External height inches5 5/16 in (135mm)
External width inches5 5/16 in (135mm)
External depth inches1 5/16 in (33mm)
Unit weight pounds0.906 lbs (0.412 kg)
RoHS certificationYes
RecyclableYes
Frequency of useVery low
Reusable partsYes
Electric conductivity (ESD)Yes
MaterialHot rolled steel (SPHC)
Steel hardness (HRB)0.65
FinishGlossy
UV resistanceHigh
System operational temperature-40°F à 122°F (-40°C à 50°C)
Steel treatmentNickel electroplating
Striations for grip16
Positioning guide16
1- Make sure you have the following parts:
4 H-2NP
4 M6-25BWZ
4 M6-NWZ
5 28mm pipes of your choice
1 Allen key or one drill provided with an Allen Key 5mm tip
2-Take four connectors H-2NP and group them around the P1 pipe.
3-Take four M6-25BWZ bolts and four M6-NWZ nuts and insert them into the corresponding openings. Make sure to put the bolts on the more accessible side.
4- Tighten the M6-25BWZ bolts and nuts M6-NWZ together a few threads , but no more.
5- Insert the P2, P3, P4 and P5 pipes within the HJ-5NP between the first and second guides as shown in the plan .
6- Tighten completely the M6-25BWZ bolts and M6-NWZ nuts together until the HJ-5NP attached firmly to the three pipes . A force of 9.8 Nm is recommended for this step.