Please select a shopping list
SKU
HJ-15NP

Flat clamp joint set

Flat clamp joint set steel cr
USD$1.88

In stock

The HJ-15NP is a metal anti-static connector that allows you to connect a pipe with a surface. This connector is a prime choice if you need to secure the surface solidly onto your Flexpipe structure. If you want to create multiple anchor and support points, this connector is the best solution in the Flexpipe system. Unlike other clamping solutions in the system, this one will create the most uniform look of all.

This joint eliminates the need to use EMT-1 and the AO-SHIM that goes with it. This is possible because the Connector itself acts as a shim. This solution creates a stronger bond between the pipe and the surface. To assemble an HJ-15NP, you need to group an H-15NP and an H-16NP with one M6-12BWZ bolt and one M6-NWZ nut.

The HJ-15NP is the only joint in the Flexpipe system that doesn’t use a standard connector bolt. Make sure you have selected the right bolt when purchasing the parts necessary to assemble this metal joint. The right Bolt for this joint is the M6-12BWZ, which requires an M6-NWZ.
More Information
Best SellerNo
Units per boxNA
Needed parts1 (H15) + 1 (H16) + 1 (M6-12B)
External height inches1 5/16 in (33mm)
External width inches2 5/8 in (67mm)
External depth inches1 5/16 in (33mm)
Unit weight pounds0.200 lbs (0.091 kg)
RoHS certificationYes
RecyclableYes
Frequency of useModerate
Reusable partsYes
Electric conductivity (ESD)Yes
MaterialHot rolled steel (SPHC)
Steel hardness (HRB)0.65
FinishGlossy
UV resistanceHigh
System operational temperature-40°F à 122°F (-40°C à 50°C)
Steel treatmentNickel electroplating
Striations for grip4
Additional reinforcement hole2
1- Make sure you have the following parts:
1H-15NP
1 H-16NP
1 M6-12BWZ
1 M6-NWZ
1 28mm pipes of your choice
1 Allen key or one drill equipped with an Allen Key 5mm tip
2-Take a connector H-15NP and a connector H-16NP and group them around the P1 pipe.
3-Take a M6-12BWZ bolt and a M6-NWZ nut and insert them into the corresponding openings. Make sure to put the bolt on the more accessible side.
4- Tighten completely the M6-12BWZ bolt and M6-NWZ nut together until the HJ-15NP attached firmly to the P1 pipe. A force of 9.8 Nm is recommended for this step.
5- Fix the HJ-15NP on the surface of your choice with a F-C61 or one appropriate screw for the select surface.